US Bureau of Reclamation funds pilot water conservation project in CO Irrigation District

0


And one in the Hood River Basin

WASHINGTON – The Federal Bureau of Reclamation announced Tuesday that it is allocating $ 219,496 for two water conservation pilot projects in central Oregon and the Hood River Basin. The Central Oregon Irrigation District and East Fork Irrigation District Water Management Pilot Projects will analyze improvements to conserve water for identified needs in their areas.

The two districts are providing $ 232,480 in cost sharing for the two pilot projects.

“Collaboration is essential for Reclamation and its partners to meet future water supply challenges,” said Chief Engineer David Raff. “These pilot projects are good examples of working together to develop proactive solutions that can work locally, regionally and across the country.”

The Central Oregon Irrigation District will develop a series of analytical tools to assess and prioritize water conservation efforts in the Deschutes River Basin.

The pilot study will examine potential water conservation projects and quantify the amount of water saved and the costs associated with each project. Once completed, water managers will be better informed to choose the best water conservation projects to restore reserved flows while ensuring the reliability of the water supply.

Partners in this pilot project include the Oregon Department of Water Resources and Deschutes River Conservancy. It builds on the recent Study of the upper Deschutes river basin. The reclamation provides $ 176,996 for this project, and the partner’s cost share is $ 187,730.

The East Fork Irrigation District will develop a sediment management plan to build on the sediment control options identified in the Hood River Basin Study. The pilot will include water quality sampling to assess sediment control measures and conceptual design of the preferred solution. Once the pilot project is completed, the district will implement a sediment control strategy to help farms improve water conservation measures. These water conservation measures will also help the district meet flow-through requirements and make water available to listed fish species. The reclamation provides $ 42,500 for this project, and the partner’s cost share is $ 44,750.

Water management options pilot projects are technical efforts that build on, update or extend the analysis and planning in a completed basin study. The funding provided is not financial assistance or a grant. Rehabilitation funding will support its staff and technical experts in their collaboration with partners on the two pilot projects.

To learn more about the water management options pilot projects, please visit www.usbr.gov/watersmart.



Source link

Share.

About Author

Comments are closed.